SELECTED PROJECT EXPERIENCE
Complex projects.
Accountable delivery.
Healthcare, residential, hospitality, corporate campus, and data center experience informs how we plan, coordinate, and deliver your project.
These examples reflect our leadership’s project delivery experience in prior roles, before SignalPoint Partners’ formation. That experience informs how we lead projects today.
HEALTHCARE
Grady Bed Bundle
Network delivery in a live hospital
12 patient areas
Managed network delivery and temporary clinical-unit relocations while protecting areas outside the construction scope.
Outcome: Delivered successfully and on time.
Scope & delivery details+
Scope: Demolition and decommissioning, structured cabling tracking, communications closet buildouts, network equipment installation, device patching, switch-port configuration, commissioning, and functional testing.
Challenge: Sequence work in an operating hospital. Set up network-connected equipment at temporary clinical locations, then transition units back into renovated spaces while protecting ongoing operations.
Delivery: Led the integration team and coordinated construction teams, cabling contractors, IT personnel, and equipment vendors through operational readiness.
Program scale: Network workstream within a hospital bed-expansion program with an estimated overall investment of $130 million. This figure describes the broader program, not the budget managed for the network scope.
STUDENT HOUSING
Reflection Student Living
Complete low-voltage systems delivery
25 stories · 742 beds · 200+ TVs
Managed installation, system integration, and customer training across residential and amenity spaces.
Outcome: Completed by the required deadline.
Scope & delivery details+
Scope: Access control, security cameras, network switches, equipment racks, and audiovisual systems, including the rooftop jumbotron.
Challenge: Set up the jumbotron, configure seamless key-fob access across amenities and individual apartments, and manage storage and installation of more than 200 living-room televisions.
Delivery: Combined project leadership with hands-on installation and managed customer training at handoff. Completed the television installation and closeout with zero issues at closeout.
STUDENT HOUSING
Inspire (Centennial Lofts)
Specialty AV and systems integration
2 buildings · 239 apartments
Managed the complete low-voltage scope, including specialty speaker and television layouts throughout the property.
Outcome: Completed on time with customer handoff.
Scope & delivery details+
Scope: Structured cabling, Wi-Fi infrastructure, network switches and equipment racks, security cameras, access control, telephone and vehicle entry systems, and audiovisual systems.
Challenge: Implement specialty speaker and television layouts, coordinating equipment placement, cabling, and installation around the design requirements of each space.
Delivery: Managed and installed the low-voltage scope from buildout through system setup, customer training, and handoff. The project is now known as Inspire; its construction name was Centennial Lofts.
HOSPITALITY
Crowne Plaza Ravinia
Speaker-system installation and testing
20 separate zones
Managed cabling, speaker installation, and testing across varied ceiling heights and materials.
Outcome: Installed and tested for client handover.
Scope & delivery details+
Scope: Cable routing, speaker installation, and testing for a new hotel speaker system spanning 20 zones.
Challenge: Adapt cable routes and installation methods to changing ceiling heights and types. All elevated installation work required scissor lifts, making access planning and equipment positioning central to delivery.
Delivery: Managed the team’s installation work and system testing through handover to the client.
CORPORATE CAMPUS
Franklin Templeton
Campus surveillance modernization
5 buildings · 125+ cameras
Replaced a 15-year-old camera system and upgraded coaxial infrastructure to Cat6 across a connected campus.
Outcome: Completed testing and client handover.
Scope & delivery details+
Scope: More than 125 new cameras, multiple camera types for different security needs, cabling upgrades, and integration across five buildings.
Challenge: Coordinate the campus-wide infrastructure transition and configure detection zones and motion detection to the security team’s specifications.
Delivery: Managed installation, system testing, and handover of the upgraded surveillance system.
DATA CENTERS
AWS Site Coordination
Cross-discipline milestone coordination
Partner teams · GC · Multiple disciplines
Worked across partner teams and the general contractor, bridging disciplines and tracking milestone schedules.
Delivery focus: Focused on meeting or exceeding milestone dates.
Scope & delivery details+
Scope: Site coordination across partner teams, the general contractor, and multiple technical disciplines.
Delivery: Tracked milestone schedules and target dates, connected teams around interdependent work, and supported coordination toward required delivery milestones.